Etkinlik

  • dabaosodmi3 bir güncelleme yayınladı 3 hafta 4 gün önce

    Picture
    Details
    Product NamePrecision Casting Transmission Shift Fork
    ProcessedLost wax Casting and Machining
    Material16MnCr5
    Weight0.03-0.27 kg
    ApplicationTransmission system
    Casting ToleranceInvestment casting ISO 8062-3 DCTG 5
    Casting Surface ConditionRa3.2 um
    Surface TreatmentHeat treatment
    Description
    The Carbon steel shift parts precision investment casting shift fork apply to vehicle and gearbox system, the material is 16MnCr5, it鈥檚 a Carbon steel, the original manufacture process is PM sinter metal, but the welding property is not good, so customer trying to change to investment casting process and they are succeed.
    As the material of this part is alloy steel rather than stainless steel, so the part need rust resistant protection, the parts also need dipping in the anti-rust oil and will package with anti-rust bag.
    Application
    Oxygen Sensor Nut is located in where there is an Oxygen sensor.
    Oxygen sensors are located within the exhaust stream, there is at least one oxygen sensor located before the catalytic converter and typically one in each exhaust manifold. Depending on the exhaust system design there may be one or two located after the catalytic converter to monitor its effectiveness.
    Casting Parts Process Flow Chart
    Wax InjectionPattern AssemblyCeramic Shell BuildDe-Waxing
    Metal PouringShell RemoveCut-OffGrinding
    Shot BlastingMachining or Surface
    TreatmentInspectionPackaging
    FAQ
    Q1: Are you are the trade company or manufacturer?
    We are a professional manufacturer with over 16years experience in investment casting, and we our main market is Europe.
    Q2. How you confirm the parts quality before delivery?
    We will 100% inspection before delivery.
    Q3: Do you have internal instruction casting defects inspection equipment?
    Yes, we have, we have X-ray, magnetic detection equipment, dye penetration inspection and so on
    Q4: Do you have the advance inspection lab
    Yes, we have the lab center to do casting inspections, can meet the customers different requirement
    Q5: What the lead time of parts?
    The lead time is about 30-45days for new projects.China Automotive Parts factory
    website:http://www.sj-casting.com/automotive-parts/